State-of-the-art distribution centre
Location
Business Park Roerstreek North
Roermond
The Netherlands
High quality specifications
- Clear height: 12.2 meter
- 33 electric operable loading docks
- 4 ground level doors
- ESFR sprinkler system
- Floor load 50 kN/sqm
Features
- 280 car parking spaces
- 10 truck parking spaces
- Motion activated LED lighting
- Gas Free Building (all electric)
Highlights
overview
Frasers Park Roermond is a brand new, state-of-the-art distribution centre in the Netherlands.
The distribution center is divided over 2 interconnected units of respectively 18,136 and 15,206 sqm, including office and mezzanine space. The office space is also divided into two separate (two-story) office components. These can be extended on the mezzanine floor.
- Brand new state-of-the-art distribution center completed
- Total NLA of 33,341 sqm, split into two units: 18,136 sqm and 15,206 sqm
- BREEAM-NL: Excellent
The new development aims to achieve BREEAM-NL ‘Excellent’, with the possibility for ‘Outstanding’ certification.
availability

Warehouse
- Unit A: 16,063m2
- Unit B: 13,399m2
- Total: 29,461m2

Office space
- Unit A: 479m2
- Unit B: 479m2
- Total 958m2

Mezzanine
- Unit A: 1,594m2
- Unit B: 1,328m2
- Total: 2,922m2

Total
- Unit A: 18,136m2
- Unit B: 15,206m2
- Total: 33,341m2
location
Roermond is situated between Venlo and Born, two cities in the province Limburg, both well-known logistics hotspots.
The A73 (Nijmegen – Venlo – Roermond) is one of the main regional transport corridors of the Netherlands. The A2 (Amsterdam – Eindhoven – Maastricht) is the most important north-south connection with access to European motorways in Belgium.
The A73 and A74 also provides a direct connection to Germany via the B52 motorway.
Location
Roermond is a medium sized city situated in the southern parts of the Netherlands.
Roermond provides close vicinity to multiple barge terminals including BCTN Terminal Roermond, which is reachable within 15 minutes driving distance.
Roermond is a good location for logistics, being close to Venlo (one of the most important European logistic areas) and Born. Roermond is also an easily accessible location due to its excellent connections to the motorways A2 and A73 as well as the close proximity to the German Ruhr area with its dense motorway system and the north of Belgium.
The new distribution center is located at business park Roerstreek North. Roerstreek North, Roerstreek South and the business park Oosttangent form together form a large commercial zone on the east side of Roermond.
Roerstreek North was established in the 1960s. A thorough restructuring took place at the end of the 1990s. More than 100 companies are located at the Roerstreek. These companies are largely engaged in industry, wholesale and logistics / distribution activities. Amonst others: UPS, Eurofrigo and Rockwool.
technical specifications

Warehouse
- Clear stacking height of 12.20 meters;
- Maximum floor load warehouse 50 kN/m2;
- Maximum point load 90 kN;
- Maximum floor load expedition 25 kN/m2;
- Flatness of the concrete floor according to NEN2747 Class 4;
- 33 electric operable loading docks with electric hydraulic levelers with a dynamic load capacity of 60 kN;
- Per unit 2 overhead doors, dim. 4 x 4.50 meter at ground level;
- LED lighting: warehouse 150 lux, expedition 300 lux, switched to 2 motion detectors per aisle, based on 4 aisles per main grid 22.6 x 11.8 meter (TBC by landlord);
- Certified ESFR Sprinkler system;
- Heating system with dunkel radiators (no less than 15 ºC).

Mezzanine
- Mezzanine floor situated above expedition area;
- Clear height under mezzanine approx. 4.30 meter;
- Mezzanine with a depth of 12 meter;
- Maximum floor load mezzanine 5 kN/m2;
- Flatness of the concrete floor according to DIN18.202 Zeile 4;
- Floor provided with balustrade and stairs per unit.
- Day light through front façade windows

Office space
- Separate entrance per office unit;
- VFR cooling, heating and ventilating system;
- Suspended ceiling with LED lighting, average light output of 500 lux;
- Motion detection lighting;
- Pantry per office per story equipped with dishwasher, refrigerator and microwave;
- Metal stud partitioning walls;
- Aluminum window frames with insulating glazing HR++;
- Openable windows with burglar-resistant hinges and locks (SKG**);
- Outside sun screens;
- Toilet facilities.

Site
- Completely fenced (2.00 meter high);
- Electric remote controlled sliding and barrier gates;
- LED outdoor lighting on the façade above loading docks and parking places.
let's talk
Get in touch



Tell us more
We know every business is unique. We'd like to hear more about your warehouse and logistics needs, so we can provide the most flexible and future focused solutions.