AutoPacific Australia

88 Atlantic Drive 

Keysborough, VIC

Australia

Introduction

AutoPacific Australia at The Key Industrial Estate

AutoPacific Australia, a market leader in vehicle accessories and towing solutions, have committed to a 5-year lease term. Their facility comprises of a 6,370 sqm warehouse, 336 sqm office and 50 car park spaces.

Property snapshot

Property size

Site 22,620 sqm

Warehouse size 6,370 sqm

Office size 336 sqm

Car park spaces 50

Completed

November 2014

950m

EastLink (M3) access via Greens Road

29km

to Melbourne CBD

46km 

to Melbourne Airport

* Please note calculations are based on radial distance and non peak hour times

4 recessed

 loading docks

3 at-grade

roller shutter doors

50

car park spaces

Rainwater

capture and re-use  

Energy efficient

sensor lighting to office and warehouse areas

ESFR

fire sprinkler system  

Location

The Key Industrial Park is situated in the well-established industrial zone of Keysborough, boasting exceptional transportation connections thanks to its proximity to the EastLink - Greens Road interchange. The estate's prime location provides unparalleled accessibility to other key arterials such as the Monash Freeway (M1), and the Eastern Freeway (M3).

Strategic access
Airport
Sport + health
Eat + drink
Transport
Open in Google Maps

Features

 

 

Alt Text

Sustainability

 

 

  • Rainwater capture and re-use

News

24.11.24

Two new leasing deals secured with Fletcher Insulation

We’re thrilled to announce that Fletcher Insulation has signed two new leases with us in Victoria, marking our third transaction with the group since 2020.

18.11.24

Solar power installation begins at The Tube, Germany

Together with Sunrock, we are excited to announce the installation of a 6.7 MWp solar power system at The Tube in Düsseldorf, Germany.

13.11.24

Frasers Property Industrial introduces new video series

In a new video series we ask our most influential thinkers how they see the future of industrial property evolving over the next century.

12.11.24

Frasers Property Limited reports FY24 full year results

Frasers Property Limited (FPL) has announced its results for the full year ended 30 September 2024 (“FY24").

06.11.24

Troy Whalan joins industry leaders on panel at PCA Industrial Lunch Queensland

We were thrilled to see Troy Whalan, General Manager – Queensland as part of a panel at the Property Council of Australia’s QLD Industrial Lunch.

Contact

Get in touch

Follow us

Stay informed on our social media channels

Recommended

frasers

New development

Rubix Connect

The Tube

Download the app

Healthy Heads in
Trucks & Sheds