Auto Parts Group

Ibis Circuit
Dandenong South, VIC
Australia

 

Introduction

Auto Parts Group at Rubix Connect

GPC Asia Pacific, a leading supplier of industrial and automotive parts and services, has secured a lease for an 11,345 sqm speculative building, which will be occupied by its subsidiary Auto Parts Group. The facility is set for practical completion in July 2025.

Property snapshot

Property size

Site 17,965 sqm 

Warehouse size 10,730 sqm

Office size 615 sqm

Car park spaces 80

Practical Completion

July 2025

3km

to EastLink (M3)

3.5km

to the Monash Freeway (M1)

35km

to Melbourne CBD

* Please note calculations are based on radial distance and non peak hour times

2 recessed

 loading docks

4 at-grade 

roller shutter doors

80

car park spaces

5 Star

Green Star Design rating (targeting)

Water saving

tapware (minimum 5 WELS rating)  

Rainwater

capture and re-use

3km

to EastLink (M3)

3.5km

to the Monash Freeway (M1)

35km

to Melbourne CBD

* Please note calculations are based on radial distance and non peak hour times

2 recessed

 loading docks

4 at-grade 

roller shutter doors

80

car park spaces

5 Star

Green Star Design rating (targeting)

Water saving

tapware (minimum 5 WELS rating)  

Rainwater

capture and re-use

Location

Meet your match

Rubix Connect is situated on Fox Drive and Taylors Road between Frankston-Dandenong Road and the Western Port Highway in the thriving Dandenong South industrial precinct. The estate is located just 2km east of an all-way access point to Frankston-Dandenong Road which then connects onward to the EastLink, South Gippsland and Monash Freeways.

Strategic access
Airport
Sport + health
Eat + drink
Transport
Open in Google Maps
frasers

Features

 

 

Alt Text
Artist's impression only

Sustainability

 

 

  • Targeting 5 Star Green Star Design & As Built V1.3 rating from the Green Building Council of Australia
  • Rainwater capture and re-use
  • Energy efficient sensor lighting to office and warehouse areas
  • Water saving tapware (min 5 WELS rating)
frasers

Learn more about Rubix Connect

News

07.10.25

LINK set to be complete in Q1, 2026

We’re making excellent progress on LINK, our new industrial and commercial park in Günzburg, Bavaria, with completion scheduled for early 2026.

06.10.25

Helping Hands Day, Europe

The European team recently came together for our annual Helping Hands volunteering day, which embraces the chance to give back to local communities while strengthening team bonds.

01.10.25

Builder appointed to deliver three facilities at The YARDS

CIP Constructions has been appointed to deliver three facilities at The YARDS, Sydney.

23.09.25

Toshiba breaks ground at The YARDS

Construction begins on new facility for Toshiba Australia at The YARDS

23.09.25

Healthy Heads in Trucks & Sheds nutrition videos

Healthy Heads in Trucks & Sheds (HHTS), has created bite-sized nutrition videos

Contact

Get in touch

Andrew McFadyen

Andrew McFadyen

Portfolio Manager - Asset Management 

 

andrew.mcfadyen@frasersproperty.com.au

Follow us

Stay informed on our social media channels

Recommended

frasers

New development

Rubix Connect

The Tube

Download the app

Healthy Heads in
Trucks & Sheds