Solar power installation begins at The Tube, Germany

19 November 2024

Together with Sunrock, we are excited to announce the installation of a 6.7 MWp solar power system at The Tube in Düsseldorf, Germany. 

 

The installation of 14,600 panels across the 74,000 sqm roof area began in September this year, with completion expected in March 2025.

 

Once complete, this system will generate 6,039MWh of local electricity which will help reduce approximately 2,627 tonnes of CO2 emissions per year.

 

Alexander Heubes, Managing Director Europe of Frasers Property Industrial, said “The Tube is our first project in Germany developed under our revised ESG requirements and it aims to achieving DGNB Platinum certification. The Tube is a great example of how a logistics property can help provide energy for consumption.” 

 

See the first stages of the solar panel installation in this video. 

 

 

 

Related News

24.11.24

Two new leasing deals secured with Fletcher Insulation

We’re thrilled to announce that Fletcher Insulation has signed two new leases with us in Victoria, marking our third transaction with the group since 2020.

18.11.24

Solar power installation begins at The Tube, Germany

Together with Sunrock, we are excited to announce the installation of a 6.7 MWp solar power system at The Tube in Düsseldorf, Germany.

13.11.24

Frasers Property Industrial introduces new video series

In a new video series we ask our most influential thinkers how they see the future of industrial property evolving over the next century.

12.11.24

Frasers Property Limited reports FY24 full year results

Frasers Property Limited (FPL) has announced its results for the full year ended 30 September 2024 (“FY24").

06.11.24

Troy Whalan joins industry leaders on panel at PCA Industrial Lunch Queensland

We were thrilled to see Troy Whalan, General Manager – Queensland as part of a panel at the Property Council of Australia’s QLD Industrial Lunch.

It helps to stay informed and ahead.
Subscribe to our latest news.