Solar power installation begins at The Tube, Germany

19 November 2024

Together with Sunrock, we are excited to announce the installation of a 6.7 MWp solar power system at The Tube in Düsseldorf, Germany. 

 

The installation of 14,600 panels across the 74,000 sqm roof area began in September this year, with completion expected in March 2025.

 

Once complete, this system will generate 6,039MWh of local electricity which will help reduce approximately 2,627 tonnes of CO2 emissions per year.

 

Alexander Heubes, Managing Director Europe of Frasers Property Industrial, said “The Tube is our first project in Germany developed under our revised ESG requirements and it aims to achieving DGNB Platinum certification. The Tube is a great example of how a logistics property can help provide energy for consumption.” 

 

See the first stages of the solar panel installation in this video. 

 

 

 

Related News

07.05.26

FY26 half year results

Frasers Property Limited (FPL) has announced its results for the half year ended 31 March 2026 (1HFY26).

07.05.26

Australia's 1st: 3.0 star NABERS Embodied Carbon Rating

Our facility for Probiotec Multipack at The YARDS has been granted the first NABERS Embodied Carbon rating.

04.05.26

FlexCity redevelopment in Germany now complete

We have completed the redevelopment of our new premium industrial and commercial park, FlexCity, in Mülheim an der Ruhr.

17.04.26

The Anchor: Certified BREEAM-NL New Construction 'Excellent'

Our distribution centre at The Anchor, Lelystad in the Netherlands has achieved a BREEAM-NL New Construction ‘Excellent’ rating.

08.04.26

PIP ANZ opens new facility at The YARDS, NSW

PIP ANZ opens its new Western Sydney facility to provide efficient distribution for its national wholesale network.

It helps to stay informed and ahead.
Subscribe to our latest news.