For lease

75-79 Canterbury Road
Braeside, VIC
Australia

Introduction

75-79 Canterbury Road at Braeside Industrial Estate

Frasers Property Industrial is offering 75-79 Canterbury Road at Braeside Industrial Estate for lease, available in November 2025. Featuring a prime flexible warehouse/office offering, Warehouse A (7,158 sqm) and Warehouse B (7,105 sqm) are available individually or as a combined facility spanning 14,263 sqm.

Property snapshot

Property size

Site 23,761 sqm 

Warehouse size 6,490 to 13,033 sqm

Office A 615 sqm

Office B 615 sqm

Car park spaces 112

 

Completed

May 2019

300m

to Mordialloc Freeway  

26km 

to Melbourne CBD

44km 

to Melbourne Airport

4 recessed

 loading docks

6 at-grade 

roller shutter doors

5 Star

Green Star Design certified rating by the Green Building Council of Australia

Water saving

sanitary fixtures (minimum 4 WELS rating)

Rainwater

capture and re-use

Location

Positioned to perform

Connectivity is key. Braeside Industrial Estate delivers fast, direct and unbeatable access in all directions. Our 23 Ha is located within 26 km of the Melbourne CBD with multiple routes to freeways via Greens Road, Dandenong Bypass and Springvale Road. Entry and exit to the estate is via a signalised intersection on Governor Road.

Strategic access
Airport
Sport + health
Eat + drink
Transport
Open in Google Maps
frasers
frasers

Features

 

 

Alt Text

Sustainability

 

 

  • Rainwater capture and re-use

News

03.06.26

Global technology and logistics provider signs lease at Venlo

New lease secured with global technology and logistics provider for more than 30,000 sqm at our Venlo facility in the Netherlands.

24.05.26

Long term lease secured with major manufacturer in Germany

One of Europe’s leading commercial vehicle manufacturers has signed a 15-year lease totalling 17,900 sqm at LINK industrial and commercial park in Günzburg, Germany.

07.05.26

FY26 half year results

Frasers Property Limited (FPL) has announced its results for the half year ended 31 March 2026 (1HFY26).

07.05.26

Australia's first NABERS embodied carbon rating

Our facility for Probiotec Multipack at The YARDS has been granted the first NABERS embodied carbon rating.

04.05.26

FlexCity redevelopment in Germany now complete

We have completed the redevelopment of our new premium industrial and commercial park, FlexCity, in Mülheim an der Ruhr.

Contact

Get in touch

Andrew McFadyen

Andrew McFadyen

Investment Manager - Asset Management 

 

andrew.mcfadyen@frasersproperty.com.au

Follow us

Stay informed on our social media channels

Recommended

The Tube

Download the app

Healthy Heads in
Trucks & Sheds

frasers

Sustainability

2030 target