Kitchen Warehouse

2 Chadderton Boulevard

Epping VIC

Australia

Introduction

Kitchen Warehouse at 4Ten Epping

Kitchen Warehouse’s standalone 16,428 sqm warehouse includes four on-grade roller doors, multiple recessed loading docks and a springing height of 11.5m, as well as a state-of-the-art office. 

Property snapshot

Property size

Site 29,300 sqm

Warehouse size 16,428 sqm

Office size 737 sqm

Carpark spaces 118

Completed

July 2022

250m

Hume Freeway access  

18km

to Melbourne CBD

12km 

to Melbourne Airport

4 recessed

 loading docks

4 at-grade

 roller shutter docks

118

car park spaces

5 Star

Green Star Design certified rating by the Green Building Council of Australia 

Water saving

sanitary fixtures (minimum 4 WELL rating)  

Rainwater

capture and re-use  

Location

Positioned to perform

Connectivity is key. Kitchen Warehouse's 4Ten Epping's location delivers fast, direct and unbeatable access in all directions.

Strategic access
Airport
Sport + health
Eat + Drink
Open in Google Maps

Features

 

 

 

Alt Text

Sustainability

 

 

  • Targeting 5 Star Green Star Design certified rating from the Green Building Council of Australia
  • Rainwater capture and re-use
  • Energy efficient sensor lighting to offices and warehouse areas
  • Water saving sanitary fixtures (min 4 WELL rating)
frasers

Learn more about 4Ten Epping

News

05.02.23

KAN Logistics Park takes shape

KAN Logistics Park is taking shape in Bemmel, Netherlands, as construction nears the halfway mark for phase one.

31.01.23

Building by Example, our interview with Qantas

We continue to lead the charge towards net-zero carbon emissions in a bid to revolutionise the broader industry – and help the planet.

30.01.23

Alexander Heubes speaks at Euroforum Annual Conference

Our Managing Director Europe spoke in a panel discussion alongside industry leaders Marc Daiß and Dr. Joachim Wieland at the Euroform Annual Conference in Berlin.

22.01.23

European team building event

Our team from Cologne, Munich and Amsterdam met in Neuss, Germany to kick start the new year.

17.01.23

Demolition nears completion at The Tube in Germany

We are on track to achieve a major sustainability milestone, with demolition almost complete at our brownfield development - The Tube, in Düsseldorf.

Contact

Get in touch

frasers

Andrew Hanna

General Manager - Victoria

Frasers Property Industrial  

 

andrew.hanna@frasersproperty.com.au

Office: +61 3 9426 1019

Mobile: +61 404 822 064

Recommended

frasers

New development

4Ten Epping

frasers

Sustainability

2030 target