Intelligent Engineering

20 Oldham Road

Epping, VIC

Australia

Introduction

Intelligent Engineering at 4Ten Epping

Intelligent Engineering, chassis manufacturer, joins 4Ten Epping. Their facility comprises of a 5,479 sqm warehouse, 350 sqm office and 56 car park spaces.

Property snapshot

Property size

Site 10,493 sqm

Warehouse size 5,479 sqm

Office size 350sqm

Carpark spaces 56

Completed

July 2022

250m

Hume Freeway access  

32km

to Melbourne CBD

20km 

to Melbourne Airport

4 at-grade

 roller shutter docks

56

car park spaces

2 storey office

ground and first floor

5 Star

Green Star Design certified rating

Water saving

tapware (minimum 5 WELS rating)  

Rainwater

capture and re-use  

Location

Positioned to perform

Connectivity is key. Intelligent Engineering's 4Ten Epping's location delivers fast, direct and unbeatable access in all directions.

Strategic access
Airport
Sport + health
Eat + drink
Transport
Open in Google Maps

Features

 

 

 

Alt Text

Sustainability

 

 

  • 5 Star Green Star Design certified rating from the Green Building Council of Australia
  • Rainwater capture and re-use
  • Energy efficient sensor lighting to office and warehouse areas
  • Water saving tapware (min 5 WELS rating)
  • Native plants and drip irrigated landscaping
  • Dedicated green walls and landscaped outdoor area
  • Energy and water metering and monitoring
  • Improved indoor environment with low VOC paints, carpet and sealants
  • 25kW rooftop solar PV
frasers

Learn more about 4Ten Epping

News

03.06.26

Global technology and logistics provider signs lease at Venlo

New lease secured with global technology and logistics provider for more than 30,000 sqm at our Venlo facility in the Netherlands.

24.05.26

Long term lease secured with major manufacturer in Germany

One of Europe’s leading commercial vehicle manufacturers has signed a 15-year lease totalling 17,900 sqm at LINK industrial and commercial park in Günzburg, Germany.

07.05.26

FY26 half year results

Frasers Property Limited (FPL) has announced its results for the half year ended 31 March 2026 (1HFY26).

07.05.26

Australia's first NABERS embodied carbon rating

Our facility for Probiotec Multipack at The YARDS has been granted the first NABERS embodied carbon rating.

04.05.26

FlexCity redevelopment in Germany now complete

We have completed the redevelopment of our new premium industrial and commercial park, FlexCity, in Mülheim an der Ruhr.

Contact

Get in touch

Follow us

Stay informed on our social media channels

Recommended

frasers

New development

4Ten Epping

The Tube

Download the app

Healthy Heads in
Trucks & Sheds